Free Drywall Estimate Calculator

Labor, materials and a real margin — know your break-even before you quote.

Price this estimate

Search for each job on the visit, or just fill in the hours and materials.

Choose from over 300 jobs

Search knows more than one name for most of these, so type what you call the job. Picking a job fills its hours and materials so you have something to correct rather than a blank box — they are typical figures, not yours. Materials means what the job costs you, before any markup. Qty is for repeats: six of the same fitting is 6, not six rows. Anything this list has never heard of, type it and press Add.

Labor cost: $0.00

Equipment, disposal or travel on this visit?
Your pricing setupmarkup, profit

What the work costs you

The part isn't the only thing you paid for. There's the run to the supply house, the wrong size going back, the money you're out until they pay, and the warranty call if it fails. Most land between 15% and 40%; on cut-and-waste materials many pros add another 5%.

What you add on top

The seized fitting, the rot behind the wall, the second trip nobody saw coming. This is padding for the job that fights you, and if nothing goes wrong it stays with you. Plenty of jobs go out at zero; 5% to 10% is common on work you can't see into.

Everything above is cost, or cover for cost. This is the one number here that isn't paying for something — it carries the slow months and buys whatever comes next. 50% is half again over those costs, 100% is double, and there's no ceiling on it.

Recommended price
$0.00
 
Labor$0.00
Materials$0.00
Break-even — your floor$0.00
Profit$0.00

Opens the drywall invoice generator with these numbers as line items — profit folded into the rates, so your customer sees a clean, itemized estimate. Without Pro, the estimate never leaves your device; with Pro, it's encrypted on your device before it syncs.

Need the estimate on paper?

The blank drywall estimate template in all 20 designs — a PDF to print, Word or Excel to fill in, CSV to import.

Estimate templates →

Print the blank without an account; the files need a free one. Your letterhead on any of them with Pro.

Drywall pricing, straight answers

How much should I charge for a drywall job?

Add up your true direct costs — labor including burden, materials with markup, and job extras like equipment or disposal. Add a contingency for surprises if the job has any. That's your break-even, the floor you never quote below. Then add your profit on top: price = break-even × (1 + profit%). This calculator runs exactly that math as you type, and shows the result both ways — what you added on to your costs, and what share of the final price that leaves you — because the two numbers are easy to confuse and quoting on the wrong one is how a job loses money.

What is labor burden and why does it matter?

Burden is everything an hour of labor costs beyond the paycheck: payroll taxes (typically 8–10% of wages), workers' compensation (a few percent for low-risk trades, well over 15% for high-risk ones like roofing or concrete), liability insurance, and paid time off. All-in burden commonly lands between 15% and 40% on top of base pay — and forgetting it is one of the most common ways a profitable-looking job loses money. If you're solo and paying yourself, you can leave it at 0%.

What's the difference between markup and margin?

Markup is a percentage added on top of your cost; margin is your share of the final price. Adding 100% on top — charging double your costs — is the same thing as a 50% margin. Quoting a markup when you mean a margin is one of the most common ways contractors underprice a job, so this calculator keeps it simple: you enter what you add on top — no cap — and it always shows what share of the final price that leaves you.

What hourly rate should I charge for drywall work?

Work backward from your own numbers instead of copying competitors: add up what you want to earn in a year plus every cost of being in business, then divide by your realistic billable hours — most drywall contractors bill far fewer hours than they work. That result is your floor. Local demand, licensing, and skill decide how far above it you can go.

How much should I mark up materials?

Somewhere between 15% and 50% is common practice across the trades, and it isn't padding: the markup pays for sourcing time, supply runs, returns, warranty callbacks, and the money you float between buying materials and getting paid. If the customer supplies materials, price the labor accordingly — you still carry the workmanship risk.

What makes a drywall job run past the hours I quoted?

Drying, not labor, is what breaks a drywall schedule. A cold basement with the heat off, a humid stretch of weather, or a heavy fill over a deep patch, and yesterday's coat is still grey in the middle at eight the next morning. You wait, or you switch to setting compound and work faster than you would like to.

The other one is what the opening shows you. A one-foot patch becomes a four-foot cut when water tracked along the top plate, and old plaster keys let go two feet past the crack the moment you lean on it, so the repair keeps growing until you reach something solid. Walls out of plane cost coats, because a flat patch across a bowed stud bay reads high until you feather it wide.

Then lifts for anything over twelve feet, sheets hand-carried up a stairwell turn, and a supply house with 1/2 inch all day but no 54 inch and no abuse-resistant. Occupied houses add the rest: containment before every sand, a vacuum pass at the end of every visit, and a customer who cannot have the room out of service as long as the coats actually take.

How do materials behave on drywall jobs?

Board is cheap by the sheet, heavy, fragile and awkward, so what it costs you lives in handling rather than the material. Count sheets wall by wall instead of by the room, and add roughly ten percent for cuts; a chopped-up remodel with a lot of openings runs higher, because the offcut from a window rarely lands where you need it next.

Thickness and width get miscounted more often than count does: 5/8 on ceilings and garages, 1/2 on walls, 54 inch for nine-foot walls, and one wrong pallet is a lost day. Specialty board — Type X, mold-resistant, abuse-resistant, cement board — is ordered rather than stocked, and substituting down is a code question, not a preference.

Compound is the sleeper. All-purpose in buckets is heavy and has a shelf life, setting compound is bought by its set time and you are committed the moment you mix it, and neither survives a night below freezing in the truck. Gypsum moves with mill announcements and freight rather than the season, and delivery and stocking are usually quoted apart from the board — a boom truck that cannot reach the second floor turns a delivery into a day of carrying.

Is this calculator free? Where do my numbers go?

Free and unlimited, no account needed. The math runs in your browser and your pricing setup saves only on your own device — we never see your numbers. Printing or sending the estimate it makes counts as a document: your first 2 are free, with no account.

Estimate$0.00