Free Electrician Estimate Calculator

Labor, materials and a real margin — know your break-even before you quote.

Price this estimate

Search for each job on the visit, or just fill in the hours and materials.

Choose from over 300 jobs

Search knows more than one name for most of these, so type what you call the job. Picking a job fills its hours and materials so you have something to correct rather than a blank box — they are typical figures, not yours. Materials means what the job costs you, before any markup. Qty is for repeats: six of the same fitting is 6, not six rows. Anything this list has never heard of, type it and press Add.

Labor cost: $0.00

Equipment, disposal or travel on this visit?
Your pricing setupmarkup, profit

What the work costs you

The part isn't the only thing you paid for. There's the run to the supply house, the wrong size going back, the money you're out until they pay, and the warranty call if it fails. Most land between 15% and 40%; on cut-and-waste materials many pros add another 5%.

What you add on top

The seized fitting, the rot behind the wall, the second trip nobody saw coming. This is padding for the job that fights you, and if nothing goes wrong it stays with you. Plenty of jobs go out at zero; 5% to 10% is common on work you can't see into.

Everything above is cost, or cover for cost. This is the one number here that isn't paying for something — it carries the slow months and buys whatever comes next. 50% is half again over those costs, 100% is double, and there's no ceiling on it.

Recommended price
$0.00
 
Labor$0.00
Materials$0.00
Break-even — your floor$0.00
Profit$0.00

Opens the electrician invoice generator with these numbers as line items — profit folded into the rates, so your customer sees a clean, itemized estimate. Without Pro, the estimate never leaves your device; with Pro, it's encrypted on your device before it syncs.

Need the estimate on paper?

The blank electrician estimate template in all 20 designs — a PDF to print, Word or Excel to fill in, CSV to import.

Estimate templates →

Print the blank without an account; the files need a free one. Your letterhead on any of them with Pro.

Electrician pricing, straight answers

How much should I charge for an electrician job?

Add up your true direct costs — labor including burden, materials with markup, and job extras like equipment or disposal. Add a contingency for surprises if the job has any. That's your break-even, the floor you never quote below. Then add your profit on top: price = break-even × (1 + profit%). This calculator runs exactly that math as you type, and shows the result both ways — what you added on to your costs, and what share of the final price that leaves you — because the two numbers are easy to confuse and quoting on the wrong one is how a job loses money.

What is labor burden and why does it matter?

Burden is everything an hour of labor costs beyond the paycheck: payroll taxes (typically 8–10% of wages), workers' compensation (a few percent for low-risk trades, well over 15% for high-risk ones like roofing or concrete), liability insurance, and paid time off. All-in burden commonly lands between 15% and 40% on top of base pay — and forgetting it is one of the most common ways a profitable-looking job loses money. If you're solo and paying yourself, you can leave it at 0%.

What's the difference between markup and margin?

Markup is a percentage added on top of your cost; margin is your share of the final price. Adding 100% on top — charging double your costs — is the same thing as a 50% margin. Quoting a markup when you mean a margin is one of the most common ways contractors underprice a job, so this calculator keeps it simple: you enter what you add on top — no cap — and it always shows what share of the final price that leaves you.

What hourly rate should I charge for electrician work?

Work backward from your own numbers instead of copying competitors: add up what you want to earn in a year plus every cost of being in business, then divide by your realistic billable hours — most electricians bill far fewer hours than they work. That result is your floor. Local demand, licensing, and skill decide how far above it you can go.

How much should I mark up materials?

Somewhere between 15% and 50% is common practice across the trades, and it isn't padding: the markup pays for sourcing time, supply runs, returns, warranty callbacks, and the money you float between buying materials and getting paid. If the customer supplies materials, price the labor accordingly — you still carry the workmanship risk.

What makes an electrician job run past the hours I quoted?

The deadfront comes off and the panel is not the panel the quote assumed. The bus is full, there are three conductors under one screw on the neutral bar, the breakers are a line nobody has made in twenty years, or half the branch circuits are aluminum and every device now needs a pigtail.

Walls do not cooperate either. A fish that should take ten minutes meets fire blocking, blown-in insulation, or a brick chimney chase behind the plaster, and the run has to go somewhere else entirely. Plaster and lath, balloon framing and a finished basement ceiling each add their own half day. An attic in July gives you about forty minutes at a stretch before you come down.

A service change waits on the utility rather than on you, and a reconnect can eat the afternoon. Add the drive to the supply house for the one part that panel accepts, and a re-inspection scheduled on somebody else's calendar. Troubleshooting has no honest hour count at all until you find it: an intermittent fault will not perform while you stand there with a meter on it, and the box it lives in is behind whatever somebody built last.

How do materials behave on electrician jobs?

Service and troubleshooting work is mostly labour and a handful of parts off the van. Rough-in and rewires are the opposite. Wire comes in fixed lengths, so a run that measures ninety feet costs you a whole spool and the remainder sits on the shelf until a job wants that gauge again. Measure long. You leave free conductor at every box, slack to reach the far side of the panel, the vertical drops, and whatever the run has to detour around.

Copper moves with the metals market, so a materials figure you wrote a month ago may not survive the counter. The things that fall out of a count are the small ones: boxes, connectors, staples, straps, wire nuts, plaster rings, counted once per opening and then forgotten.

Breakers have to match the panel, and older lines get scarce and sometimes only turn up reconditioned — which is a decision to make with the customer rather than for them. Fixtures and gear are where the lead times live: a panel, a meter socket, a transfer switch or a commercial light package can be weeks out while the wire sits on site. Customer-supplied fixtures arrive without the mounting hardware, or with a driver that will not dim on the switch they already bought.

Is this calculator free? Where do my numbers go?

Free and unlimited, no account needed. The math runs in your browser and your pricing setup saves only on your own device — we never see your numbers. Printing or sending the estimate it makes counts as a document: your first 2 are free, with no account.

Estimate$0.00