Price this estimate
Search for each job on the visit, or just fill in the hours and materials.
Choose from over 300 jobs
Search knows more than one name for most of these, so type what you call the job. Picking a job fills its hours and materials so you have something to correct rather than a blank box — they are typical figures, not yours. Materials means what the job costs you, before any markup. Qty is for repeats: six of the same fitting is 6, not six rows. Anything this list has never heard of, type it and press Add.
Labor cost: $0.00
Equipment, disposal or travel on this visit?
One question, asked once
Do you pay anyone besides yourself? It decides whether payroll tax, workers' comp and benefits need to be inside your labor rate.
Your pricing setupmarkup, profit
What the work costs you
An hour on someone's check isn't what that hour costs you. Payroll tax, workers' comp, liability insurance and the days they're paid but not on a job all come with it. Most crews land between 25% and 35%.
The part isn't the only thing you paid for. There's the run to the supply house, the wrong size going back, the money you're out until they pay, and the warranty call if it fails. Most land between 15% and 40%; on cut-and-waste materials many pros add another 5%.
What you add on top
The seized fitting, the rot behind the wall, the second trip nobody saw coming. This is padding for the job that fights you, and if nothing goes wrong it stays with you. Plenty of jobs go out at zero; 5% to 10% is common on work you can't see into.
Everything above is cost, or cover for cost. This is the one number here that isn't paying for something — it carries the slow months and buys whatever comes next. 50% is half again over those costs, 100% is double, and there's no ceiling on it.
Do you take a deposit to start?
Money down before the work begins, so you are not buying materials out of your own pocket. It goes on the estimate your customer signs.
A percentage follows the job — change the work and the deposit moves with it. Half down is common on material-heavy work; a flat figure suits a small repair.
Put in how much you need to start, or choose "No deposit" instead.
Opens the flooring invoice generator with these numbers as line items — profit folded into the rates, so your customer sees a clean, itemized estimate. Without Pro, the estimate never leaves your device; with Pro, it's encrypted on your device before it syncs.
Need the estimate on paper?
The blank flooring estimate template in all 20 designs — a PDF to print, Word or Excel to fill in, CSV to import.
Estimate templates →Print the blank without an account; the files need a free one. Your letterhead on any of them with Pro.
Flooring pricing, straight answers
How much should I charge for a flooring job?
Add up your true direct costs — labor including burden, materials with markup, and job extras like equipment or disposal. Add a contingency for surprises if the job has any. That's your break-even, the floor you never quote below. Then add your profit on top: price = break-even × (1 + profit%). This calculator runs exactly that math as you type, and shows the result both ways — what you added on to your costs, and what share of the final price that leaves you — because the two numbers are easy to confuse and quoting on the wrong one is how a job loses money.
What is labor burden and why does it matter?
Burden is everything an hour of labor costs beyond the paycheck: payroll taxes (typically 8–10% of wages), workers' compensation (a few percent for low-risk trades, well over 15% for high-risk ones like roofing or concrete), liability insurance, and paid time off. All-in burden commonly lands between 15% and 40% on top of base pay — and forgetting it is one of the most common ways a profitable-looking job loses money. If you're solo and paying yourself, you can leave it at 0%.
What's the difference between markup and margin?
Markup is a percentage added on top of your cost; margin is your share of the final price. Adding 100% on top — charging double your costs — is the same thing as a 50% margin. Quoting a markup when you mean a margin is one of the most common ways contractors underprice a job, so this calculator keeps it simple: you enter what you add on top — no cap — and it always shows what share of the final price that leaves you.
What hourly rate should I charge for flooring work?
Work backward from your own numbers instead of copying competitors: add up what you want to earn in a year plus every cost of being in business, then divide by your realistic billable hours — most flooring installers bill far fewer hours than they work. That result is your floor. Local demand, licensing, and skill decide how far above it you can go.
How much should I mark up materials?
Somewhere between 15% and 50% is common practice across the trades, and it isn't padding: the markup pays for sourcing time, supply runs, returns, warranty callbacks, and the money you float between buying materials and getting paid. If the customer supplies materials, price the labor accordingly — you still carry the workmanship risk.
What makes a flooring job run past the hours I quoted?
Almost all of it is what comes up when the old floor comes up. Vinyl over particleboard over a second layer of vinyl, black cutback under that, and a day of scraping nobody priced. Tile means grinding thinset back to bare slab, which is slower than the demolition was. Carpet leaves a few thousand staples behind.
Once the deck is bare the straightedge finds the dip the pad was hiding, so you are pouring leveler and waiting on it to cure before a plank goes down, and soft subfloor at the toilet or the back door turns into framing work. A slab that reads wet stops the job outright, because nothing you glue down will stay down and no warranty survives ignoring it.
Access decides the rest. A third-floor walk-up with tile on your shoulder, a store you can only touch after closing, and furniture nobody moved all cost hours. So does the supply house, when the stair nose and transitions ship separately and land days after the flooring, or a run turns out to be short and the balance comes from a different lot.
How do materials behave on flooring jobs?
This trade carries real material cost, often more than the labor, and most of it you supply and bill through. Order the whole job at once rather than room by room, because a second order rarely matches: wood, tile and carpet all run in lots and dye lots, and a reorder off a different run is visibly not the same floor.
Waste is a physical fact, not padding. Around 10% covers cuts on a straight lay, diagonal and herringbone want more, and a floor full of closets and jogs wants more again. Carpet does not work in percentages at all, since a 13-foot room off a 12-foot roll costs you a fill strip whatever the square footage says.
Trim, transitions, stair nose, underlayment and adhesive are what get counted last and counted short, and on tile the thinset, grout, membrane and edge profile are a real proportion of the job that an allowance written against the tile alone will not cover. Mill prices move on notice, so what was quoted in spring is not always what it costs in fall — and leftover material belongs with the customer, labelled, because the repair three years from now has no other source.
Is this calculator free? Where do my numbers go?
Free and unlimited, no account needed. The math runs in your browser and your pricing setup saves only on your own device — we never see your numbers. Printing or sending the estimate it makes counts as a document: your first 2 are free, with no account.