Price this estimate
Search for each job on the visit, or just fill in the hours and materials.
Choose from over 300 jobs
Search knows more than one name for most of these, so type what you call the job. Picking a job fills its hours and materials so you have something to correct rather than a blank box — they are typical figures, not yours. Materials means what the job costs you, before any markup. Qty is for repeats: six of the same fitting is 6, not six rows. Anything this list has never heard of, type it and press Add.
Labor cost: $0.00
Equipment, disposal or travel on this visit?
One question, asked once
Do you pay anyone besides yourself? It decides whether payroll tax, workers' comp and benefits need to be inside your labor rate.
Your pricing setupmarkup, profit
What the work costs you
An hour on someone's check isn't what that hour costs you. Payroll tax, workers' comp, liability insurance and the days they're paid but not on a job all come with it. Most crews land between 25% and 35%.
The part isn't the only thing you paid for. There's the run to the supply house, the wrong size going back, the money you're out until they pay, and the warranty call if it fails. Most land between 15% and 40%; on cut-and-waste materials many pros add another 5%.
What you add on top
The seized fitting, the rot behind the wall, the second trip nobody saw coming. This is padding for the job that fights you, and if nothing goes wrong it stays with you. Plenty of jobs go out at zero; 5% to 10% is common on work you can't see into.
Everything above is cost, or cover for cost. This is the one number here that isn't paying for something — it carries the slow months and buys whatever comes next. 50% is half again over those costs, 100% is double, and there's no ceiling on it.
Do you take a deposit to start?
Money down before the work begins, so you are not buying materials out of your own pocket. It goes on the estimate your customer signs.
A percentage follows the job — change the work and the deposit moves with it. Half down is common on material-heavy work; a flat figure suits a small repair.
Put in how much you need to start, or choose "No deposit" instead.
Opens the lawn care invoice generator with these numbers as line items — profit folded into the rates, so your customer sees a clean, itemized estimate. Without Pro, the estimate never leaves your device; with Pro, it's encrypted on your device before it syncs.
Need the estimate on paper?
The blank lawn care estimate template in all 20 designs — a PDF to print, Word or Excel to fill in, CSV to import.
Estimate templates →Print the blank without an account; the files need a free one. Your letterhead on any of them with Pro.
Lawn Care pricing, straight answers
How much should I charge for a lawn care job?
Add up your true direct costs — labor including burden, materials with markup, and job extras like equipment or disposal. Add a contingency for surprises if the job has any. That's your break-even, the floor you never quote below. Then add your profit on top: price = break-even × (1 + profit%). This calculator runs exactly that math as you type, and shows the result both ways — what you added on to your costs, and what share of the final price that leaves you — because the two numbers are easy to confuse and quoting on the wrong one is how a job loses money.
What is labor burden and why does it matter?
Burden is everything an hour of labor costs beyond the paycheck: payroll taxes (typically 8–10% of wages), workers' compensation (a few percent for low-risk trades, well over 15% for high-risk ones like roofing or concrete), liability insurance, and paid time off. All-in burden commonly lands between 15% and 40% on top of base pay — and forgetting it is one of the most common ways a profitable-looking job loses money. If you're solo and paying yourself, you can leave it at 0%.
What's the difference between markup and margin?
Markup is a percentage added on top of your cost; margin is your share of the final price. Adding 100% on top — charging double your costs — is the same thing as a 50% margin. Quoting a markup when you mean a margin is one of the most common ways contractors underprice a job, so this calculator keeps it simple: you enter what you add on top — no cap — and it always shows what share of the final price that leaves you.
What hourly rate should I charge for lawn care work?
Work backward from your own numbers instead of copying competitors: add up what you want to earn in a year plus every cost of being in business, then divide by your realistic billable hours — most lawn & landscape crews bill far fewer hours than they work. That result is your floor. Local demand, licensing, and skill decide how far above it you can go.
How much should I mark up materials?
Somewhere between 15% and 50% is common practice across the trades, and it isn't padding: the markup pays for sourcing time, supply runs, returns, warranty callbacks, and the money you float between buying materials and getting paid. If the customer supplies materials, price the labor accordingly — you still carry the workmanship risk.
What makes a lawn care job run past the hours I quoted?
Rain runs the schedule and it costs you twice. A storm week puts you a visit behind and grows the lawn a third again, so a yard quoted at one pass takes a high cut, a second lower pass and bagging, because wet clippings clump and the customer sees rows of hay.
Access is the other one. A sixty inch rider that will not clear the side gate turns a forty minute property into a walk-behind afternoon, and nothing on an aerial measurement tells you the gate is thirty-six inches wide. On an overgrown reclaim you are mowing blind, since fence posts, rebar, landscape timbers and half a cinder block all live in knee-high grass, so you walk it first and you buy blades when you do not.
Then the yard-waste site closes at noon and the haul-off you planned for the end of the day becomes tomorrow morning. Spring and fall carry their own overruns: the first cut of the year is two cuts, leaf season doubles every property on the route, and one breakdown in peak week — a spindle, a belt, a flat on the trailer — pushes an entire day of properties into a Saturday.
How do materials behave on lawn care jobs?
Mowing is labour, fuel and blades, and there is nothing to count. The rest of the trade carries product, and all of it is sold by coverage rather than by the piece.
A bag of fertilizer is rated for a square footage at one spreader setting, so run it at a starter or pre-emergent rate and the same bag covers a fraction of that. The other shortfall comes from measuring the parcel instead of the turf, since the house, the drive, the beds and the patio are not lawn. Mulch is bought by the cubic yard and a yard runs about a hundred square feet at three inches, so beds eyeballed from the truck come up short.
Sod is less forgiving, because it is perishable, curves and edges eat several percent in cut waste, and a pallet left through a hot afternoon is gone. Seed behaves the same way on a different clock — the rate for overseeding and the rate for bare soil are not the same number, and the straw or blanket over it is a second purchase people forget. Equipment consumables are the quiet line: blades sharpened or replaced, trimmer line by the spool, belts, filters and fuel, all bought in bulk and never charged to the job that wore them out.
Is this calculator free? Where do my numbers go?
Free and unlimited, no account needed. The math runs in your browser and your pricing setup saves only on your own device — we never see your numbers. Printing or sending the estimate it makes counts as a document: your first 2 are free, with no account.