Free Restoration Invoice & Estimate Template (Word, Excel, PDF)
A restoration invoice template is the billing side of a loss file: what got wet or burned, the equipment that stood in the room and how long it stood there, the footage cleaned and the footage cut out, and who pays which share. Mitigation is invoiced while the structure is still drying, long before anyone talks about rebuilding.
Your logo and business details, printed at the top of every one of these.
Get Pro — $8.99 a monthModern Accent band, the flagship
Your browser’s own print dialog, on the sheet shown here — Letter, nothing else on the page. Without Pro, printing a pad counts as one of your 2 free documents; printing the same pad again is free.
The PDF is exactly what you see. Word and Excel are the same design, editable — the PDF is the one to print from, and Excel adds it up. Print the blank here without an account; the files need a free one.
Rather fill it in here? Open the Restoration invoice generator with the Modern design →What belongs on a restoration invoice?
Restoration bills a loss in phases, so keep the phases apart on the page: emergency response and source containment first, then mitigation, then cleaning and deodorization, then contents, each its own group with its own subtotal. Say in the header which of them this invoice covers, because the mitigation side is settled on its own and usually settles first. Carry the claim number and the carrier, and reference by date the work authorization and the direction of pay signed at the door, since those two pages are what make an entry at two in the morning billable work rather than a favor. Put the deductible where the homeowner cannot miss it, because carriers apply it to the first draft they issue and on most losses that draft is yours, not the rebuilder's. Then the lines the phase actually produced: emergency water shutoff and source containment, board-up of a single window or a whole storefront, moisture mapping, a contents inventory made before anything moves.
How to fill in the restoration invoice template
Fill the lines in the order the job ran, and make every line declare what it bills by, because no two of them are necessarily sold the same way. Extraction goes by method and by depth: truck-mount at a thousand square feet and up, a portable in one room, weighted extraction on glue-down carpet, a pump-out banded at up to six inches or over twelve, stair water extraction per flight. Equipment goes per unit per day, and name the unit, because an air mover, an LGR or desiccant dehumidifier, an Injectidry wall cavity system and a hardwood drying mat are four different rentals, and paperwork that calls them all fans undersells the three that took drilling and hose. Labor goes per technician-hour, so a four-technician mobilization bills four hours inside the first hour. Antimicrobial treatment goes per square foot of affected area. Containment goes by the barrier you actually hung, wall and ceiling poly, with each zippered door counted separately. Soot work usually goes per room.
Common restoration line items, and what each one runs
Here are 24 of the 325 jobs the online version can fill in for you, with the hours and materials a typical one takes. They are starting points, not prices — what you charge is yours.
| Line item | Typical hours | Materials at cost |
|---|---|---|
| Emergency water extraction | 4 hrs | $65 |
| Air mover (per unit, per day) | 6 min | $3 |
| Dehumidifier (per day) | 9 min | $6 |
| Antimicrobial treatment (per sq ft) | 1.5 hrs | $45 |
| Demolition & debris removal | 6 hrs | $450 |
| Emergency response — after hours | 3 hrs | $35 |
| Moisture mapping & documentation | 1.5 hrs | — |
| Air scrubber / HEPA (per day) | 12 min | $14 |
| Containment barrier (per sq ft) | 2.5 hrs | $70 |
| Negative air setup | 1.5 hrs | $60 |
| Carpet & pad removal (per sq ft) | 3 hrs | $95 |
| Flood cut drywall (per linear ft) | 4 hrs | $105 |
| Cabinet removal & disposal | 4.5 hrs | $175 |
| Mold remediation (per sq ft) | 12 hrs | $225 |
| Category 3 / sewage cleanup (per sq ft) | 10 hrs | $300 |
| Contents pack-out (per hour) | 10 hrs | $650 |
| Contents cleaning & storage | 12 hrs | $350 |
| Smoke & soot cleaning (per sq ft) | 14 hrs | $425 |
| Thermal fogging / deodorization | 3 hrs | $120 |
| Drying monitoring (per visit) | 1.5 hrs | — |
| Board-up & tarping | 3.5 hrs | $190 |
| Final clearance testing | 1.5 hrs | $425 |
| Burst pipe water cleanup | 5 hrs | $125 |
| Sewage backup — full cleanup | 14 hrs | $550 |
Three invoicing mistakes that cost restoration crews money
First, one demolition line. Carpet and pad, wet insulation, subfloor, trim, cabinets and flood cut drywall come out at different rates and go back at different rates, and a single demolition total leaves the reconstruction estimate nothing to be written against, so whoever rebuilds measures the house from scratch. Second, billing Category 3 like cleaning. Sewage and biohazard work carries a disposal path a wipe-down does not: sanitized subfloor removal, regulated medical waste by the container, a hazardous waste manifest somebody coordinates. None of that survives inside a line that just says cleanup. Third, one invoice for a loss that crossed a demising wall. When water leaves one unit and lands in the one below it, that is usually a second owner, a second policy and a second signature, so the second unit gets its own invoice under its own claim, or you have done half the work for a party who never hired you.
Common questions
What has to be signed before the first air mover goes in?
A work authorization and a direction of pay, both dated the day you arrived. The authorization is what makes the work billable: it names the scope, the address and whoever opened the door, and without it a night call-out is work you did for a stranger. The direction of pay asks the carrier to send the mitigation draft to you rather than through the homeowner — most carriers honor it, none are bound by it, and an assignment of benefits is the instrument that actually moves the claim. Get the deductible acknowledged in the same sitting, since it is the one number no policy pays and that conversation goes better before the equipment lands. At the far end, the final walkthrough and certificate of completion is the matching page, and it turns your last line into a payable one.
Do the contents get billed apart from the structure?
Yes, split them, because the two are usually paid out of different parts of the policy on different schedules. The structure is the building; contents pack-out, cleaning, storage and disposal are the homeowner's belongings. Bill pack-out by the hour against an inventory made before anything moves, then keep storage vault rental as a recurring monthly line rather than a single charge, because a vault goes on billing long after the structure is finished. Specialty work carries its own units: electronics decontamination and testing by the item, textile laundering by the load, document freeze drying by the box. Anything non-salvageable leaves with a photographed itemized list attached, since the contents side is settled off that list and a bag nobody itemized is a bag nobody pays for.
How should a mold remediation invoice be laid out?
As a sequence, in the order it gets reviewed. Start with the mold remediation work plan and protocol, a deliverable in itself. Then containment, measured as the poly you hung, with each zippered door counted separately, then the negative air setup stated with what it held: commonly four air changes an hour at around minus 0.02 inches of water column. Removal and bag-out come next, then HEPA vacuuming per room, then mold encapsulant on framing that stayed. Where your state wants an independent assessor, keep the post-remediation air clearance re-test off your own invoice: bill the coordination and let their report carry the result. Federal EPA guidance treats an isolated patch under about ten square feet as a different job from a multi-room remediation, so say which you did.
Is a smell that comes back after the job closed a callback or new work?
New work if the source was never inside your scope, a warranty callback if it was — and your own first invoice decides which. Odor sealing and encapsulation covers a cleaned surface; it never covers a source nobody removed. If shellac odor sealing went over cleaned framing and the smell is back out of insulation, ductwork or a cavity nobody opened, name the source, the area and the removal, and that is new scope. If the source sat inside what you already billed, absorb the re-treatment. Either way, say on the first invoice what the deodorization line covered and name the method, because a hydroxyl generator runs by the day in an occupied house while ozone treatment needs the space empty and aired out before anyone goes back in.
The same twenty designs, filled for other trades
All invoice templatesRestoration invoice generatorRestoration estimate calculatorWhat goes on an invoice