Free Gutter Invoice Template
A gutter invoice template is a fill-in form that turns a hung run into a billable record: footage by elevation, outlet and miter counts, downspout drops, guard type, and the ladder labor behind each one. Fill it in your browser, print it or send a PDF, no account and nothing uploaded.
Downloads are blank and unbranded — no email, no account, nothing to unsubscribe from. The browser version does the arithmetic and prints to PDF.
What belongs on a gutter invoice?
Break the footage out by elevation - front, rear, garage side - instead of one house-wide number, because each of those is a separate run and every future repair call names one of them. Each run gets its outlet count and drop size (2x3 or 3x4), elbow count, and miters split inside from outside, since miters and outlets are per-each parts and per-each labor. Name the hanger style and its spacing on center, tighter where snow sits. Record the pitch you set on each run, dropping from the high end down to the outlet. Cleaning lines need the story count for that elevation, plus a separate line for pulling guards and putting them back. Guards get a brand, a profile, and micro-mesh or screen. Underground tie-ins carry the 811 locate ticket number, pipe diameter and trench depth. Heat cable needs the circuit it landed on and who supplied it. Say whether debris left with you.
How to fill in a gutter invoice
Gutter bills in four shapes at once, so use four kinds of line. Run work - seamless trough, guards, screens, heat cable, brightening, old gutter removal, buried drain - goes per linear foot, measured off what actually got hung rather than off the estimate, because the coil is formed on site and the number moves. Countable parts go per each with a quantity: downspouts, extensions, elbows, hangers, miters, splash blocks, rain chains. Cleaning goes flat per elevation with the story count named. Repair work - reseal, re-pitch, re-hang, unclogging - goes hourly, because you do not know what you have until the ladder is up. Put removal and haul-off of the old gutter on its own line instead of folding it into the install, and keep fascia and soffit carpentry on their own lines too; that is different work carrying a different warranty.
Common gutter line items, and what each one runs
These are the 305 jobs the online version can fill in for you, with the hours and materials a typical one takes. They are starting points, not prices — what you charge is yours.
| Line item | Typical hours | Materials at cost |
|---|---|---|
| Gutter cleaning — single story | 2 hrs | — |
| Seamless gutter install (per ft) | 6 hrs | $550 |
| Downspout install (each) | 1.5 hrs | $90 |
| Gutter guards (per ft) | 5 hrs | $700 |
| Repair — reseal & re-pitch | 2 hrs | $40 |
| Gutter cleaning — two story | 3 hrs | — |
| Gutter cleaning — three story | 4 hrs | — |
| Fascia repair (per linear ft) | 5 hrs | $260 |
| Soffit repair (per linear ft) | 5 hrs | $240 |
| Downspout extension (each) | 1 hr | $35 |
| Underground drain tie-in (per linear ft) | 6 hrs | $380 |
| Oversized 6 in gutter (per linear ft) | 7 hrs | $750 |
| Copper gutter (per linear ft) | 10 hrs | $2,400 |
| Half-round gutter (per linear ft) | 8 hrs | $1,100 |
| Hanger / bracket replacement (each) | 30 min | $8 |
| Miter & corner replacement (each) | 1 hr | $45 |
| Splash block (each) | 15 min | $15 |
| Rain chain install | 1 hr | $90 |
| Gutter brightening (per linear ft) | 2.5 hrs | $30 |
| Heat cable install (per linear ft) | 5 hrs | $450 |
| Old gutter removal (per linear ft) | 3 hrs | $60 |
| Twice-yearly maintenance plan | 4 hrs | — |
| Re-hang & re-slope | 3 hrs | $80 |
| Leaf guard cleaning | 2.5 hrs | — |
Three gutter invoicing mistakes that cost you
Three mistakes cost gutter crews real money. First, burying guard removal and reinstall inside a cleaning line - micro-mesh comes off screw by screw and goes back the same way, and a customer looking at one line reading gutter cleaning has no idea two hours of it were guards. Second, billing a reseal and re-pitch with no scope limit: you sealed two corners and re-hung one sagging section, but a line that reads only repair tells the customer the whole house was made watertight, so name the seams and the run you touched and say which runs you did not. Third, leaving guard terms off entirely. A manufacturer clog-free claim belongs to the manufacturer, and if the invoice never says who covers a return trip and when, every later clog turns into a free ladder day for you.
Common questions
Do I invoice gutter work by the linear foot or by the job?
Both, on the same invoice, split across different lines. Anything the machine runs or you attach along the run - seamless trough, guards, screens, heat cable, drain pipe, old gutter removal - is per linear foot, measured off what actually got hung. Anything you can point at and count - downspouts, elbows, hangers, miters, outlets, splash blocks - is per each with a quantity. Cleaning and maintenance visits read better as a flat line per elevation with the story count named. Repairs where you cannot see the cause until you are up there go hourly. Four line types on one gutter invoice reads far clearer than a single lump.
How do I bill a gutter cleaning when the guards have to come off?
As two lines, never one. Write the cleaning line with its story count, then a separate line for guard removal and reinstall carrying the footage and the guard type, because micro-mesh screwed into the front lip is a different afternoon than a drop-in screen you lift out by hand. Add what you found underneath: crushed mesh, screws spinning in the fascia, a panel too bent to reseat. Anyone who bought a guard system was told they would never need cleaning again, so that second line is also your explanation. Note whether the debris left with you or stayed on site.
What goes on the invoice when the fascia is bad and the customer wants the gutter hung anyway?
A dated line naming the condition, your recommendation to replace, and the customer's decision to decline. Keep the fascia repair on the invoice as a declined line with zero quantity, so the offer stays on the record instead of living in a conversation nobody remembers. Say which elevation and which section of the run it covers, then say how you hung it anyway: the hanger spacing you used, whether you caught rafter tails or solid framing behind the board, and that your workmanship warranty on that section excludes the board it is fastened to. Get initials on it if the customer is home. That one line decides a sag argument twelve months out.
Does the 811 locate ticket belong on an underground downspout tie-in invoice?
Yes - put the ticket number and the locate date right on that line. Calling 811 before you dig applies everywhere in the US, so a buried drain line billed without it reads like you skipped the call. Add trench depth, pipe diameter, solid versus corrugated, the discharge point, and how far from the foundation it ends. Reference a photo of the open trench with the pipe seated in it before backfill. Buried work is invisible the day after you drive off, and this invoice is the only surviving record of what is actually down there.
Gutter invoice generatorGutter estimate calculatorWhat goes on an invoice