Free Concrete Invoice & Estimate Template (Word, Excel, PDF)
Concrete sells in four units at once, and a concrete invoice template is the form that keeps them apart: square feet of flatwork at a stated thickness, linear feet of footing, forming and sawcut, cubic yards of ready-mix delivered, and tons over the recycler's scale. Poured steps bill by the step, post footings each.
Your logo and business details, printed at the top of every one of these.
Get Pro — $8.99 a monthModern Accent band, the flagship
Your browser’s own print dialog, on the sheet shown here — Letter, nothing else on the page. Without Pro, printing a pad counts as one of your 2 free documents; printing the same pad again is free.
The PDF is exactly what you see. Word and Excel are the same design, editable — the PDF is the one to print from, and Excel adds it up. Print the blank here without an account; the files need a free one.
Rather fill it in here? Open the Concrete invoice generator with the Modern design →What belongs on a concrete invoice?
Concrete bills by area, length, volume and weight on the same page, so the unit belongs beside every line, not once in a header. Flatwork carries square feet and thickness together, because a cubic yard covers about 81 sq ft at 4 in. and only 54 at 6 in. Footings, forming and stripping, curb and gutter and sawcut control joints price per linear foot, and a foundation wall wants its height too: a 4 ft frost wall and a 10 ft basement wall form at different speeds down the same run. Give reinforcement a size and a spacing — #4 bar at 16 in. on center, or 6x6 mesh — and show fiber as the plant sells it, a dose per cubic yard. Name the compacted base under the slab and the 10 mil vapor barrier on an interior pour. Repair lines want the crack measured in feet and the method named, and demolition carries tons hauled rather than square feet once the breaker starts.
How to fill in the concrete invoice template
Work the paper in the order the job happened: mobilization, slab demo and removal, excavation, base prep and compaction, forms, rebar and wire mesh, the pour, then finishing and sealing. Put the thickness in every flatwork description, because a square-foot number without it cannot be defended. Poured steps go by the step, with the landing on its own line since it is a slab, not a riser. Core holes take a diameter and a depth apiece. Ready-mix arrives by the cubic yard, so a yardage line squares what the plant delivered against the area you placed. Bill a stamped or exposed aggregate finish as an upgrade over broom finish per square foot instead of re-pricing the slab underneath. A repair day that is all labor — chipping out spalled edges, packing repair mortar, grinding a patch flush — bills as a crew day, half or full, with the three men and the equipment on one line rather than as square feet.
Common concrete line items, and what each one runs
Here are 24 of the 322 jobs the online version can fill in for you, with the hours and materials a typical one takes. They are starting points, not prices — what you charge is yours.
| Line item | Typical hours | Materials at cost |
|---|---|---|
| Driveway pour (per sq ft) | 18 hrs | $2,700 |
| Sidewalk / patio slab | 12 hrs | $1,100 |
| Slab demo & removal | 8 hrs | $450 |
| Stamped or colored finish upgrade | 15 hrs | $1,550 |
| Crack repair & sealing | 3.5 hrs | $130 |
| Garage slab (per sq ft) | 16 hrs | $2,900 |
| Shed / equipment pad | 8 hrs | $700 |
| Footings (per linear ft) | 10 hrs | $950 |
| Foundation wall (per linear ft) | 24 hrs | $4,500 |
| Curb & gutter (per linear ft) | 12 hrs | $1,300 |
| Poured steps (per step) | 11 hrs | $950 |
| Exposed aggregate finish (per sq ft) | 14 hrs | $1,400 |
| Broom finish (per sq ft) | 10 hrs | $950 |
| Rebar & wire mesh (per sq ft) | 4 hrs | $350 |
| Base prep & compaction (per sq ft) | 6 hrs | $380 |
| Sawcut control joints (per linear ft) | 2 hrs | $60 |
| Concrete sealing (per sq ft) | 3.5 hrs | $190 |
| Pump truck | 4 hrs | $900 |
| Excavation & haul-off | 8 hrs | $450 |
| Forming & stripping (per linear ft) | 8 hrs | $300 |
| Fiber-mesh additive | — | $90 |
| Cold-weather blankets | 1 hr | $180 |
| Spalling & surface repair | 5 hrs | $280 |
| Driveway apron replacement | 11 hrs | $1,100 |
Three invoicing mistakes that cost concrete contractors money
First, quoting tear-out and replacement as one square-foot number. Demo prices over an area, disposal by weight, and a 4 in. slab runs roughly two and a half tons per hundred square feet, so a drive that leaves in three loads instead of two eats the difference. Second, letting the slab grow between the quote and the truck. A pad quoted for a car and now carrying a camper takes more yardage, a #5 mat at 12 in. on center where mesh was quoted, and a thickened edge, so write it up as a dated line and get it initialed before the plant is called. Third, running small work with no floor under it. Trip-hazard grinding on one panel is twenty minutes under the machine inside a three-hour job once loading, hauling and cleanup are counted, so a small-job minimum and an equipment mobilization line belong on the invoice.
Common questions
Should a builder get one invoice at the end or one per pour?
One per stage. Footings bill once the rebar check has passed and the pour is in, because the wall goes up on top of them and the trench closes behind it. The wall bills after stripping, and the garage slab and drive apron bill once the framers are gone. Waiting for the drive to go in next spring leaves the footing money sitting through the whole build. Attach the delivery tickets for each stage's yardage, since that is what a builder's office reconciles your square feet against. Commercial work often holds retainage, so show it as its own subtracted line and name what releases it — the flatness survey on a warehouse floor, backfill and inspection on a wall — rather than as an unexplained shortfall.
Is slab lifting billed by the panel or by the hole?
By the panel on a sidewalk, since a panel is the unit a customer can stand on and count. Under a driveway or a garage floor the void decides the day, so bill the settlement probe and void survey first, then the lifting, then hole patching and cleanup, separate work from the lift. Say which material went under: slurry mudjacking and polyurethane foam do not weigh, travel or cure the same, and the customer will look up both words. Write what lifting does not do — a panel brought back to grade is level again, not uncracked — and put the re-check visit on the paper as a scheduled line, because ground that moved once can move again.
Does a crack repair invoice need to name the method?
Yes, with the footage under each method. Cracking sells by the linear foot, and a rout and seal, backer rod under a self-leveling sealant, epoxy injection and staples across a moving break are four different jobs at four different numbers. Bill the assessment separately — the visit, the footage walked, the widths found — because until a crack is routed open nobody knows which of the four it takes, and a figure written from standing height is a guess. Where measured footage differs from the quote, show both numbers side by side. On a foundation wall, say whether you sealed a crack or stopped water through it: epoxy bonds a dry crack, polyurethane goes into one that is still leaking.
How should sawing and core drilling be billed?
By the hole and by the foot, with the scan as its own line. Cores bill each by diameter and depth — a 4 in. core through a 6 in. slab and a 12 in. core through a foundation wall are not one price — and sawing bills per linear foot with the depth stated, since a full-depth cut and a control-joint pass are different blades. Name the reinforcement you expected; a bar mat eats segments, and a post-tension cable stops the job until a GPR scan is run and recorded. Wet and dry are different lines. Wet cutting makes slurry to vacuum and haul off, and the federal OSHA silica rule specifies water for saws and core rigs, so going dry moves the job onto its alternative path: an exposure assessment and dust controls that hold exposure under the limit — on top of the written exposure control plan the rule requires on either path.
The same twenty designs, filled for other trades
All invoice templatesConcrete invoice generatorConcrete estimate calculatorWhat goes on an invoice