Free Painting Invoice & Estimate Template (Word, Excel, PDF)
A painting invoice template is a fill-in form for coating work, where the billable thing is a stack on a surface rather than a single service: what the substrate was, what primer sealed it, what topcoat went over that, how many passes. Written that way, one page prices a kitchen, a fence and a garage floor without any of them blurring together.
Your logo and business details, printed at the top of every one of these.
Get Pro — $8.99 a monthModern Accent band, the flagship
Your browser’s own print dialog, on the sheet shown here — Letter, nothing else on the page. Without Pro, printing a pad counts as one of your 2 free documents; printing the same pad again is free.
The PDF is exactly what you see. Word and Excel are the same design, editable — the PDF is the one to print from, and Excel adds it up. Print the blank here without an account; the files need a free one.
Rather fill it in here? Open the Painting invoice generator with the Modern design →What belongs on a painting invoice?
Quantities carry a painting invoice, and a room is not one of them. Put the dimensions on the line, twelve by fourteen under an eight-foot ceiling, or the measured wall area, which is perimeter times ceiling height, not the floor square footage on a tax bill. Every per-unit line needs its count written out: square feet of wallpaper removal and popcorn ceiling removal, linear feet of fence staining, doors by the side with jamb and casing billed per opening, windows one at a time, cabinet doors and drawer fronts tallied apart from boxes and face frames, shutters by the pair, columns and dormers each on their own, siding replacement by the board. Name the substrate as you found it, because the substrate chose the primer: new drywall wants a sealer, bare cedar a knot and tannin block, bare block a masonry filler, a rusting steel railing a rust-inhibitive metal primer. Elastomeric stucco and garage floor epoxy carry both numbers, coats and dry mils.
How to fill in the painting invoice template
Order the page the way you worked the building: room by room inside, elevation by elevation outside, and within each one ceilings first, then walls, then trim and baseboard painting, then doors, so it can be read from the doorway. Keep prep on lines above the finish work, not folded into it: pressure wash surface prep, caulking and sealing, drywall repair before paint, a primer coat per room. Interior work is usually flat-quoted with the scope beneath it: three rooms, two coats, walls only. Measured work goes per unit, square feet on popcorn ceiling removal and deck staining, linear feet on fence staining, doors by the side, thousands of square feet on a sprayed warehouse wall, per flight in a commercial stairwell. Hold time and material for what nobody can see yet, wood rot repair and wallpaper glue removal. Paint and materials get their own line. Color consultation, sample boards and on-site patches happen before a drop cloth leaves the van, so date them at the top.
Common painting line items, and what each one runs
Here are 24 of the 324 jobs the online version can fill in for you, with the hours and materials a typical one takes. They are starting points, not prices — what you charge is yours.
| Line item | Typical hours | Materials at cost |
|---|---|---|
| Interior — per room, 2 coats | 6 hrs | $100 |
| Exterior — prep & paint | 32 hrs | $850 |
| Cabinet refinishing | 24 hrs | $380 |
| Drywall texture match | 3 hrs | $35 |
| Trim & baseboard painting | 6 hrs | $100 |
| Ceiling paint — per room | 3.5 hrs | $60 |
| Accent wall | 2.5 hrs | $45 |
| Interior door — per side | 1 hr | $15 |
| Primer coat — per room | 2.5 hrs | $55 |
| Wallpaper removal (per sq ft) | 6 hrs | $40 |
| Popcorn ceiling removal (per sq ft) | 10 hrs | $75 |
| Deck staining (per sq ft) | 8 hrs | $200 |
| Fence staining (per linear ft) | 10 hrs | $300 |
| Pressure wash — surface prep | 3 hrs | $20 |
| Caulking & sealing | 3 hrs | $50 |
| Wood rot repair | 4 hrs | $130 |
| Garage floor epoxy (per sq ft) | 12 hrs | $650 |
| Stair railing & spindles | 8 hrs | $90 |
| Exterior trim only | 10 hrs | $220 |
| Color consultation | 1.5 hrs | — |
| Paint & materials | — | $250 |
| Two-tone trim upgrade | 5 hrs | $80 |
| Whole-house interior repaint | 48 hrs | $1,400 |
| Drywall repair before paint | 3 hrs | $40 |
Three invoicing mistakes that cost painters money
First, a room line that does not say which surfaces it covers. Per room can mean walls only, or walls with the ceiling, the trim and both faces of every door, and the difference is most of a day. Write the surfaces into the line, and say whether the closets count. Second, no return-to-service window on anything that cures. Cabinet enamel is dry in an hour and hard in weeks, so a customer who reloads the uppers on day two prints every shelf edge and calls it a defect; a garage floor coating that takes foot traffic overnight will still lift under a hot tire for days. Put those dates on the invoice. Third, one number for the outside of a house. Body, trim, soffit and fascia, the detached garage, a single elevation: these get added and dropped up to the morning you start, and one exterior price leaves nothing to subtract.
Common questions
How do I bill a lead swab test that comes back clean on a pre-1978 house?
Per painted component, and bill it either way, because that is how the test works. A lead-free finding counts only when a certified renovator uses an EPA-recognized kit, or a certified inspector or risk assessor tests it, and it clears only the component tested: a clean swab on the casing says nothing about the window stool beside it. Where lead turns up, containment, the scrape and spot prime of failing coats, the cleanup and the clearance wipe are lines of their own, not a fold in a room price. Two federal prohibitions belong in the notes, since customers ask you to skip them: torching painted surfaces is barred outright, as is a heat gun above eleven hundred degrees Fahrenheit, while machine sanding is allowed only shrouded and on a HEPA vacuum. Encapsulation with an approved coating gets its own line, priced against removal.
How should I bill a color change once the first coat is on?
As a change order dated the day it is asked for, never a conversation at the walkthrough. Price it by whole surfaces, not by what is left to do: a new color cannot be blended into a wall already coated, and a paint break only reads clean at an inside corner, a trim edge or a chair rail. Every plane the change touches gets recoated corner to corner, and the cut-in at ceiling lines and corners is a separate pass that now happens twice. Name which rooms take the new color and which were finished in the first, so one page can carry two prices without the second looking like an overcharge. Where the new color was matched to something already in the house, custom color matching is its own line.
What should a cabinet refinishing invoice say?
Start with a count: doors and drawer fronts are the unit, and kitchen is not. Boxes and face frames belong on a separate line, since those are brushed and rolled in place while the doors are usually sprayed off-site; say which, because doors leaving the house means living without them for days. Prep carries the job: degreasing, de-glossing or scuff sanding, oak cabinet grain filling where a smooth painted finish is wanted, then a bonding primer, since a factory catalyzed finish gives nothing to grip. Name the topcoat by class, a waterborne alkyd or a catalyzed conversion varnish, not just enamel. Cabinet hardware removal and rehang is its own line, as is new hardware when the holes move.
What goes on an invoice for a deck or a fence?
The unit and the measurement, which differ between the two. Deck staining is priced by the square foot of walking surface, with railings, stairs, skirting and the joists underneath billed apart. Fence goes by the linear foot, and the line carries the height and whether one face or both got coated, since a six-foot privacy fence done on two sides is twice the job the neighbor quoted. Name the product class beside the color, since it sets what the next recoat can be: you can climb in opacity, semi-transparent over a weathered clear, solid over semi-transparent, porch enamel over solid, but never back down without stripping. Give stripping and brightening its own line where it happened, and board replacement a per-board line with the count.
The same twenty designs, filled for other trades
All invoice templatesPainting invoice generatorPainting estimate calculatorWhat goes on an invoice